My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153495 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153495 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 1:59:12 PM
Creation date
12/6/2012 1:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153495
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
jointly agreed upon following discussions between the City, CWCB, and MKE, but <br />shall not be less than 30 years. <br />Reservoir inflow shall be established for the longest period that can <br />reasonably be achieved. This will permit the determination of the annual <br />average maximum and minimum storage content that are not unduly influenced by <br />critically dry periods. <br />An analysis of the City's daily water production, maximum supply rate, peak <br />consumption, required fire flow, and minimum storage requirements shall be <br />made and presented in tabular form. <br />A water utilization analysis for Barnes Meadow Reservoir shall be made as part <br />of the study and presented in tabular form summarizing monthly surface water <br />operation studies and showing how the project water supply will be enhanced by <br />performing the necessary rehabilitative work to make the reservoir fully <br />operational. <br />A chemical and physical an a the e . veloped from the project shall <br />be performed. As the primary se b er is for municipal and industrial <br />purposes, observations shall a regarding taste, color, odor, biocides <br />and other parameters than mi a feet project facilities or service and the <br />types of treatment required or human consumption. Any special requirements <br />for selective withdrawal, fish screens, etc. shall be assessed and discussed. <br />An analysis of reservoir sedimentation shall be made at the reservoir and <br />diversion works. <br />Task 7 - CHAPTER V, Plan of Development <br />7.1 General <br />A summary of the present configuration of Barnes Meadow Reservoir Dam shall be <br />presented along with a description of the physical status of the existing <br />facility based on the comprehensive site inspections carried out under Task 2. <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.