My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153573 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153573 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 2:00:37 PM
Creation date
12/6/2012 1:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153573
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Design. Criteria and Standards used in design will include the <br />following: <br />(1) Sizing criteria for hydraulic features that are to be modi- <br />fied. <br />(2) Resevoir losses. <br />(3) Structural design criteria, including assumptions used for <br />stability analysis. <br />(4) Volume and peak discharge of inflow design floods for spill- <br />way design. <br />(5) Not applicable. Hourglass Dam is a storage dam. <br />(b) Flood hazard evaluation, including erosion conditions. <br />(7) Not applicable. No river plan s are involved. <br />(8) Not applicable. Canal ai of involved. <br />(9) Not applicable. No p p a to be included. <br />(10) Not applicable. No pump' amps are to be included. <br />(11) Not applicable. No pump plants are to be included. <br />(12) Not included. No pipelines are to be included. <br />(13) Availability and sources of required construction materials <br />will be described. <br />(14) Care and handling of water during construction will be <br />described. <br />d. Structure Plans. Proposed major and minor structures will be <br />described. <br />(1) Not applicable. Neither canals nor pipelines are to be <br />included. <br />(2) Layout and sections will be included for all major structures <br />and for typical minor structures. <br />e. Drainage. Present drainage problems will be described for Hour- <br />glass Dam, and drainage improvements to alleviate damage to the <br />dam will be described. <br />f. Sedimentation. Not applicable to the Hourglass Dam rehabilitaion <br />project. <br />g. Right-of-Way. Right- of-Way requirements will be discussed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.