My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153573 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153573 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 2:00:37 PM
Creation date
12/6/2012 1:50:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153573
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Chapter VI. Estimated Costs. <br />a. Costs of Construction. Costs of construction will be furnished in <br />accordance with the Colorado Water Conservation Board's format. <br />The following will be included. <br />(1) The deviation of unit construction costs and pertinent fac- <br />tors affecting estimated construction costs will be <br />described. <br />(2) A tabulation of construction quantities, unit costs and total <br />costs will be included for each type of work or material for <br />each major structure and each class of minor structure. <br />(3) A summary titled "SUMMARY OF PFDJECT COSTS" will be inclu,led. <br />It will be on the Colorado Water Conservation Board's <br />approved format. <br />(4) The allowance for cunt es w' discussed. a minimum <br />-- - -- - - -- - - -- ... - contingency of 20 P .. s ' y-- appropriate- for <br />feasibility level <W4 ab' n studies. <br />(5) The allowance for fururjk � ' escallations will be discussed. <br />It will be specifical •,; erf ified in the cost summary as <br />( "Projected Price Incr,' } . <br />(6) Total project cosy_ will include interest during construction <br />that the City of Greeley may have to pay. <br />(7) Other cost elements will be discussed as may be appropriate. <br />They will include engineering, administration and any other <br />project costs. <br />b. Fund Requirement Schedule. Annual fund requirements will be shown <br />by fiscal years for each year of the construction period. <br />C. Operation, Maintenance, and Replacement Costs. A tabulation of <br />estimated future operation, maintenance and replacement costs will <br />be included. Estimated future costs will be compared with current <br />costs. The tabulation will be made in budget form. <br />d. Emergency Operating Fund. An EMERGENCY OPERATING FUND will be <br />established, in accord apace with the Colorado Water Conservation <br />Board's quidelines, as required. <br />8. Chapter VII. Project Evaluation. A Project Evaluation will present an esti- <br />mate of the City's payment capacity. The basis of payment capacity and justifi- <br />cation therefore, will be discussed. The payment capacity is expected to <br />include municipal and industrial water as well as reduction in operation and <br />maintenance costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.