Laserfiche WebLink
5. Chapter IV. Water <br />a. Water Requirements. <br />(1) Development of water requirements for municipal and Indus- <br />trial water, including peak hourly, daily, weekly and monthly <br />uses. <br />(2) Agricultural water supplies are not involved. <br />(3) Water losses from point of diversion to point of delivery are <br />not considered relevant. <br />(4) Monthly Water Diversion requirements are not considered rele- <br />vant. <br />(5) Projected project requirements are not expected to change <br />during payout period, since no reservoir expansion is <br />included. <br />b. Surface Water Supply. <br />(1) Water releases from Hourglas 11 g'ven for 10 <br />- - -- - - -_. - - - - - -- - - - - -- - -- consecutive years. <br />(2) Neither recreational nor; d benefits are being <br />claimed for Hourglass Res ir. <br />(3) Daily water production, ma im rate, peak consump- <br />tion and the like are not c e applicable to Hourglass <br />Dam rehabilitation. <br />C. Ground -water Supply. Ground -water supply is not considered to be <br />applicable. <br />d. Water Rights. <br />(1) Effective water rights and permits, including dates of <br />priority will be included. Their effect on availability of <br />present and future water supply will be discussed. <br />e. Water Utilization. Water utilization is not considered to be <br />applicable to the Hourglass Dam rehabilitation project. <br />f. Water Quality. A general statement of water quality will be <br />included. Detailed information is not considered to be appropri- <br />ate for the existing dam rehabilitation. <br />6. Chapter V. Plan of Development. <br />a. Physical Plan. Several conceptual rehabilitation plans will be <br />prepared for Hourglass Dam. These will include reservoir floor, <br />blanketing, slurry wall cutoff and seepage collection. Sketch <br />designs will be prepared for the promising conceptual plans. Their <br />various components will be described and the purposes to be <br />servred will be discussed. The operation of the existing and the <br />rehabilitated dam will be described. <br />All dam rehabilitation plans will conform to the State Engineer's <br />current Safety Standard <br />