My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence 1991-1992 Including Draft MOU's
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Correspondence 1991-1992 Including Draft MOU's
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 3:33:41 PM
Creation date
8/2/2012 3:35:12 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Correspondence 1991-1992 Including Draft MOU's
State
CO
Title
Correspondence 1991-1992 Including Draft MOU's
Water Supply Pro - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. WHEREAS, Reclamation and the Basin States wish to staff a <br />"Steering Committee" which shall be formed to provide direction <br />in the development of said program plan. <br />NOW, THEREFORE, in consideration of the mutual covenants <br />herein contained, Reclamation and the Basin States hereto agree <br />as follows: <br />SERVICES TO BE PERFORMED <br />3. a. To the extent that funds are advanced by the Cooperating <br />Partners through the Agreement, and that Federal funds are <br />available for this purpose, Reclamation shall, with its staff, <br />use said funds to complete the development of the Program Plan as <br />set forth in the Scope of Services (Attachment B) and as directed <br />by the Steering Committee described in this MOU. <br />b. Upon completion, Reclamation shall transmit to the Basin <br />States and Cooperating Partners, its final Program Plan as <br />scheduled, which may be used for a precipitation management <br />demonstration program should such a program be authorized. <br />COMPENSATION <br />4. a. The total payments made by the Cooperating Partners as <br />provided in the Agreement shall not exceed $91,000. These <br />payments when combined with Federal funds in the amount of <br />$90,000 are estimated to permit the completion of the Program <br />Plan as set forth in Attachment B. Adjustments in the details of <br />the Program Plan specified in Attachment B, with the consensus of <br />the Steering Committee and the Cooperating Partners, may be <br />necessary to assure that the project plan is completed within the <br />monies hereby provided. <br />PROJECT MANAGER <br />5. a. The Basin States hereby agree that Reclamation shall be <br />the Project Manager and shall perform and carry out the duties <br />and responsibilities required of the Project Manager under this <br />MOU. <br />b. Subject only to the express limitations of this MOU and <br />the Agreement, the approval of the Cooperating Partners and the <br />Steering Committee, the Project Manager is authorized in the <br />development of the Program Plan to incur costs, liabilities, and <br />obligations up to the amounts approved and funded by the Parties <br />to the Agreement and to perform or arrange for the performance of <br />study investigations. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.