Laserfiche WebLink
Bid Modification Schedule <br />Hu4ick Bid Amount: $ 593,490.00 <br />1 Bid Item 10 - Roadbase: $ (3,600.00) <br />This does not seem to be an integral part of the work. The reservoir could be built and be <br />fun tional without a roadbase surface. The owner could have roadbase placed at a later <br />poi t in time as funds allow. <br />2 Ge technical Testing: $ (4,500.00) <br />Prc 'ect specifications require contractor to carry the cost of testing for compaction of trench <br />ba fill. HEI carried a budget amount for this work. Owner can take this requirement out of <br />the contract and may be able to reduce the scope and thereby reduce the cost to owner. <br />3 Ch nge Pipe Specification $ (6,000.00) <br />Change all references from c9OO to sdr26 pvc. C900 is commonly used as a waterline pipe, <br />an is pressure rated. Our application does not need to operate under pressure. Also, change <br />all eferences from slot perforations to (curb drain standard perforations) 1 /2" holes, 2 rows, <br />120 degrees apart, 5" O.C. This should give same function without the cost. <br />Engineering Total. $ (14,100.00) <br />4 HEI would propose to adjust the riprap spec to 6 " +. We could pick out "boulders" though. <br />5 HE has received gradations from Tom Dea, we have made a deduction to our crush /screen <br />6 HE would prefer payment by the 15th of the month (15 day terms), provided pay application <br />is s ibmitted by the 25th of the prior month. <br />Ba ed upon 6,7,8 $ (13,590.00) <br />Contract Amount: $ 565,800.00 <br />