My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
House Joint Resolution 03-1068
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
House Joint Resolution 03-1068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2012 8:57:42 AM
Creation date
7/11/2012 4:35:06 PM
Metadata
Fields
Template:
Water Supply Protection
Description
House Joint Resolution 03-1068 Concerning the creation of an interim committee to study state government expenditures.
State
CO
Title
House Joint Resolution 03-1068
Water Supply Pro - Doc Type
Record of Decision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
On or before August 4, 2003, the successful vendor will provide a preliminary draft report on <br />the likely cost savings in each Division, assuming full implementation of all recommendations. <br />On or before October 6, 2003, the successful vendor will provide a draft final report with a plan <br />and schedule for implementation of all recommendations. <br />The project will be completed no later than November 4, 2003. The successful vendor will <br />provide the Executive Director of the Department of Natural Resources with a final report by <br />November 4, 2003. <br />Future projects involving related studies or implementation of recommendations may be <br />amended to the original contract or awarded as separate contracts to the selected contractor, <br />at the option of the state. <br />Project Budget <br />The budgeted amount for this project is $150,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.