Laserfiche WebLink
TABLE 5 <br />COST ESTIMATE <br />KNOTH RESERVOIR <br />Alternative No. 1- GH 20 <br />LTNIT <br />ITEM DESCRIPTION UANTITY UNITS PRICE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. $26,741.25 $26,741 <br />2• StriPPing 4.00 Acre $1,500.00 $6,000 <br />3. Dam <br />a. Embankment Excavation 3400.00 C.Y. $3.00 $10,200 <br />b. Dam Face & EmbanlQnent Fi1L 11000.00 C.Y. $3.00 $33,000 <br />c. Cutoff Trench Excavation & Fill 12300.00 C.Y. $5.00 $61,500 <br />d. Riprap 8900.00 TONS $25.00 $222,500 <br />e. Riprap Bedding 2600.00 TONS $20.00 $52,000 <br />f. Road Gravel 975.00 TONS $15.00 $14,625 <br />g. Toe Drain 500.00 L.F. $30.00 $15,000 <br />4. Spillway <br />a. Excavation 1200.00 C.Y. $2.00 $2,400 <br />b. Concrete Cutoff Wall 55.00 C.Y. $400.00 $22,000 <br />c. Riprap 500.00 TONS $25.00 $12,500 <br />d. Riprap Bedding 145.00 TONS $20.00 $2,900 <br />5. Existing Outlets <br />a. Breach Excavation & Fill @ Sta 14+00 250.00 C.Y. $8.00 $2,000 <br />b. Breach Excavarion & Fill @ Sta 21+50 1000.00 C.Y. $8.00 $8,000 <br />c. Maintenance & Repair on Gate + Operator 1.00 L.S. $10,000.00 $10,000 <br />6. Culvert @ Inlet Ditch <br />a. 8' x 8' x 18' Concrete Box Culvert 18.00 L.F. $350.00 $6,300 <br />b. Excavarion & Bac�ll 160.00 C.Y. $25.00 $4,000 <br />7. Outlet Ditch to Supply Canal <br />a. Concrete Lined Ditch 650.00 L.F. $56.00 $36,400 <br />b. Earth Ditch - Excavation 2000.00 C.Y. $5.00 $10,000 <br />8. Borrow 2000.00 C.Y. $1.75 $3,500 <br />9. Seeding 2.00 Acres $2,000.00 $4,000 <br />TOTAL CONSTRUCTION COST $565,566 <br />