My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150138 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150138 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 8:51:35 AM
Creation date
10/5/2011 10:51:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150138
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 6 <br />COST ESTIMATE <br />KNOTH RESERVOIR <br />Alternative No. 2- GH 25 <br />UNIT <br />ITEM DESCRIPTION UANTITY UNITS PRICE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. $52,860.00 $52,860 <br />2. Stripping 6.00 Acre $1,500.00 $9,000 <br />3. Dam <br />a. Embanlanent Excavation 3200.00 C.Y. $3.00 $9,600 <br />b. Dam Face & Embankment Fill 47700.00 C.Y. $3.00 $143,100 <br />c. Cutoff Trench Excavation & Fill 13800.00 C.Y. $5.00 $69,000 <br />d. Riprap 19000.00 TONS $25.00 $475,000 <br />e. Riprap Bedding 5500.00 TONS $20.00 $110,000 <br />f. Road Gravel 1150.00 TONS $15.00 $17,250 <br />g. Toe Drain 500.00 L.F. $30.00 $15,000 <br />4. Spillway <br />a. Excavation 1200.00 C.Y. $2.00 $2,400 <br />b. Concrete Cutoff Wall 55.00 C.Y. $400.00 $22,000 <br />c. Riprap 500.00 TONS $25.00 $12,500 <br />d. Riprap Bedding 145.00 TONS $20.00 $2,900 <br />5. Existing Outlets <br />a. Breach Excavation & Fill @ Sta 14+00 250.00 C.Y. $8.00 $2,000 <br />b. Breach Excavation & Fill @ Sta 21+50 1000.00 C.Y. $8.00 $8,000 <br />c. Maintenance & Repair on Gate + Operator 1.00 L.S. $10,000.00 $10,000 <br />6. Culvert @ Inlet Ditch <br />a. 8' x 8' x 18' Concrete Box Culvert 18.00 L.F. $350.00 $6,300 <br />b. Excavation & Backfill 160.00 C.Y. $25.00 $4,000 <br />7. Outlet Ditch to Supply Canal <br />a. Concrete Lined Ditch 650.00 L.F. $56.00 $36,400 <br />b. Earth Ditch - Excavation 2000.00 C.Y. $5.00 $10,000 <br />8. Borrow 53000.00 C.Y. $1.75 $92,750 <br />9. Seeding 3.00 Acres $2,000.00 $6,000 <br />TOTAL CONSTRUCTION COST $1,116,060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.