Laserfiche WebLink
Y ) <br />• Ability to Manage Stream Flow within the 15 Mile Reach <br />• General Environmental effects <br />• Water Quality Impacts <br />• Affect to Stream Flow within other locations in the upper Colorado River Basin <br />• Fisheries and Aquatic Habitat Impacts <br />• Project Cost <br />Please note that these evaluation criteria are not listed in order of importance as those values and <br />relationships have not been determined by the Steering Committee. <br />10825 Phase 2 Scope of Work Revised May 25, 2007 per CWCB request Page 4 <br />