My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153671 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C153671 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:53:54 PM
Creation date
8/4/2011 2:57:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153671
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IIVOOR�WaI`t:-C � <br />WCC performed investigations to establish design criteria to remediate seepage in the <br />area of the existing outlet works and to increase the size of the spillway to accommodate <br />75 percent of the Probable Maximum Flood. The fast track project required the field <br />investigation, feasibility study, design, review, and construction to be completed in six <br />months. WCC assisted the Windsor Reservoir and Canal Company in obtaining <br />financing for the project from the Colorado Water Conservatian Boazd. WCC also <br />provided cost estimates for the rehabilita.tion of the spillway and embanlcment and <br />provided construction observation and management services during the rehabilitation of <br />the dam and spillway. <br />Kemmerer City Dam, Wyoming - A landslide threatened the access road to a major <br />regionai recreational area surrounding the lake. In conjunction with design and <br />construction of other impravements to the d landslide was stabilized by unloading <br />the crest, constructing drains under t edirect groundwater, and improving <br />surface drainage. WCC provided se mcludin ' tigation; preparation of designs, <br />specifica.tions and cost estima c t e ering. <br />Grand River interceptor Ditch, Colorado - This interceptor ditch in Rocky Mountain <br />National Pazk diverts water to the east slope for irrigation. The ditch is about 100 years <br />old and pre-dates the National Pazk. In late spring of 1992 a laadslide occurred along <br />a portioa of this ditch blocking access to upstream portions of the projec� A geologic <br />reconnaissance coacluded that the landslide was largely confined to overburden soils <br />which averlie a steep bedrock surface. Recommendations were made relative to <br />stabilizing the slide and to retard slide debris from continuously ravelling down onto the <br />maintenance road. <br />Telluride Airport, Colorado - WCC investigated the fa.ilure mechanism and the cause of <br />failure for the landslide which took out a portion of the runway fill, closed the state <br />highway to Telluride, and buried a sand and graveI plant in the river valley bottom. Air <br />travel to the town was restricted until the slide azea was stabilized. <br />Hourglass Reservoir, Larimer Count�, Colorado - WCC conducted a feasibility level <br />geotechnical study for rehabilitating the city of Greeley's Haurglass Dam. A field <br />reconnaissance was made of the condition of the embankment and local geologic <br />wooawand-chrde consu�aMs <br />233601PR0_3 12-08-93(8:53Na)IRPT 3-% <br />
The URL can be used to link to this page
Your browser does not support the video tag.