My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153671 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C153671 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:53:54 PM
Creation date
8/4/2011 2:57:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153671
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.. - � <br />Woodward-CI <br />Our investigations indica.ted that the major portion of the dam would have to be rebuilt. <br />We provided continuous construction inspection and materials testing services during <br />dam reconstruction. Construction was completed in 1989. <br />Long Pond Dam, Fort Collins, Colorado - WCC conducted a hydrolagy study and <br />prepared plans, specifications, and cost estunates for rehabilitation of this earth�ill <br />irrigation supply dam. Fast-track specification prepazation and construction enabled dam <br />rehabilitation to be completed in time for the next irrigation season. WCC also provided <br />construction observation and management services for the rehabilitation of the dam. <br />Worster Dam, near Fort Cotlins, Colorado - Worster Dam was constructed near the turn <br />af tbe century and consists af an earth embankment with a concrete upstream facing. <br />The dam is approximately 8U feet i t rest length of approximately 700 feet. <br />WCC was retained by the owne the condidons of the existing outlet <br />structure, the stability of the d t s page exiting the downstream face <br />of <br />the dam. WCC assisted th r� asibility study and preparing a <br />feasibility report which was submitted to the Colorado Water Coaservation Board to <br />procure fina.ncing for the project. WCC is currently preparing design plans and <br />specifications for rehabilitatian of the dam and outlet works and in 1994 will serve as the <br />owner's engineer and construction manager during the construction phase of this project. <br />McKenzie-Wildcat Ditch, Colorado - This ditch intercepts and conveys water for <br />agriculture in the mountains of central Colorado. A portion of the ditch crossing one <br />af the state's largest slci azeas was destroyed by a landslide in the spring of 1987. WCC <br />investigated the mechanism of the slide, designed a buttress reinforced with synthetic <br />geogrid materials to restore operation of the ditch, and has performed long term <br />monitoring of instrurnentation to detect further movements. Measured movement since <br />completion of the repairs has been very small. <br />Douglas Dam, near Fort Collins, Colorado - In 1990, WCC assisted the owner in an <br />emergency release of water and subsequent safety evaluation of this 39-foot-high <br />embankment dam, after the owner observed seepage on the downstream slope. A seep <br />approximately 50 feet tong and 4 feet high with a flow rate of approximately 15 gpm had <br />developed'in the area above the outlet structure. <br />Woodward-Clyde Consulta�rts <br />23360JPR0.3 12-Oa-93(s:53am)1RPT 3-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.