My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Park Ditch Improvement Project_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - Park Ditch Improvement Project_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2012 2:47:41 PM
Creation date
7/14/2011 3:32:15 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Park Ditch Company
Description
Park Ditch Improvement Project
Account Source
Basin
Board Meeting Date
7/21/2009
Contract/PO #
10000000011
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Report on Happy Scenes Water System, #1 Inc. Water System Upgrade <br />Funding Source: Southwest Basin Account <br />The Happy Scenes Water System serves potable water to homes, located north of Vallecito <br />Reservoir, in La Plata County, Colorado. The System serves 60 taps and an estimated population <br />of 160 people. In past years the system was fed by water from springs. Recently the water has <br />been shown to be influenced by surface water. The required filtration and treatment to make <br />this water safe was very expensive. The cost of monitoring made this option financially <br />unfeasible. A new well was drilled and a new treatment building was constructed. <br />It is at this point that the System came to the Colorado Water Conservation Board with a <br />request for grant money to complete this project. The System received a grant for $50,000. This <br />money allowed for three stages of construction to be completed and the new well fed system <br />to replace the old system. The three stages or "tasks" are as follows: <br />TASK 1— Preparation of interior of pump house for equipment <br />Description of Task <br />Build the chlorination room <br />Install chlorination door and main entry door <br />Install four ventilation windows <br />Insulation of ceiling <br />Installation of attic floor and access door <br />Apply wafer board to the interior of all walls to allow for mounting of pipe and <br />equipment <br />Painting the interior of the pump house with a water proof paint <br />Trimming the exterior <br />This work was completed on a time and materials basis by Quentin Wray, Inc. <br />Total cost: $8,008 <br />TASK 2— Purchase and installation of pumping equipment <br />Description of Task <br />Purchase and install well pump, Two booster pumps, treatment equipment, Pump controls, <br />two pressure tanks, piping in pump house, meters, backup and supplemental equipment. <br />This work was completed by Brooks Well Service <br />Total cost: $35,244 <br />
The URL can be used to link to this page
Your browser does not support the video tag.