Laserfiche WebLink
Proiect Task 4 Description: Encase section of open irrigation ditch that has experienced blowout activity in <br />pipeline. _ <br />After the access road was created to this section of the ditch, the pipe materials were staged at the <br />blowout section location. Following this, heavy equipment was used to excavate the ditch for <br />preparation in laying the pipe, installing the pipe and backfilling the 58� feet of this blow out sectifln. Final <br />grade and drainage were also completed. <br />Qther non-invoiced in-kind work provided by Park Ditch Company personnel for this task was: project <br />management, engineering, surveying and staking, general labor, acquiring required permits frorn the US <br />Forest Service and the CDOT and seeding per US Forest Service requirements. <br />Thank you for all of your assistance with and support for this project. We look forward to working with <br />you again in the future. <br />Respectfully Submitted, <br />� . <br />_ � . , , , ,: <br />... �i ;•' �- . ; �.�: <br />_ �� ..�_. �_-�, <br />-- - - -- `� <br />_ , <br />Sheila Berger � <br />Authorized Representati�e, Park Ditch Company <br />cc: Mr. Mike Preston, Chair, Southwest Basins Roundtable <br />