My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Park Ditch Improvement Project_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - Park Ditch Improvement Project_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2012 2:47:41 PM
Creation date
7/14/2011 3:32:15 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Park Ditch Company
Description
Park Ditch Improvement Project
Account Source
Basin
Board Meeting Date
7/21/2009
Contract/PO #
10000000011
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Ditch Company, Inc. <br />2980 E. Highway 150 <br />Pagosa Springs, CO, 81147-9741 <br />December 9, 2049 <br />Mr. Greg Johnson <br />Colorado Water Conservation Board <br />Intrastate Water Management and Development <br />�.580 Logan Street, Suite 200 <br />Denver, CO 80203 <br />RE: Park Di#ch Improvement Projec# Final Repor# <br />Dear Mr. Johnson: <br />With this let�er, the Park Ditch Company wishes to close out its CWCB Water Supply Reserve Account <br />$85,000 gran#, P.O. # �� PDA 10�a00q4Q11. Photographs of the completed project have been sent to <br />yvu under separate cover. Please note that this project has been completed a full year ahead af the <br />schedule proposed in our grant application. <br />The tasks for which the Park Ditch Company has incurred costs on this project and for which we <br />requested reimbursement can be further described as: <br />Prolect Task 2 Descriptiion: Replacement of Park Ditch head gates. <br />The head gate materials were first staged at the head gate location. Following this, the head gate, sheet <br />piling, sluce gate and trash catcher, and trash collector were fabricated and installed. <br />�ther non-in�oiced in-kind work provided by Park Ditch Company personnel for this task was; project <br />management, surveying and sfiaking for #he head gate replacement, general labor, str-uctural welding, and <br />seeding per US Forest Service requirements. <br />Proiect Task 3 Descripfiion: Encase section of open irrigation ditch that has experienced landslide activity in <br />pipeline, <br />Work invoiced included using heavy equipment to cut an access road to the pro}ect work area. After the <br />access road was completed, heavy equipmen� was used to stabilize the ditch bank, to exca�ate the ditch for <br />preparation in laying the pipe, and to exca�ate 420 feet for a French Drain. <br />Other nvn-invviced in-kind work provided by Park Ditch Company personne! for this task was: project <br />management, engineering, staking and surveying the slide repair section, general labor, repairing US Forest <br />Service fences and gates, acquiring required permits from the US Forest Service and the CD�T and seeding <br />per IJS Forest 5ervice requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.