My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tamarack Contract and Supporting Docs
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Tamarack Contract and Supporting Docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2011 1:44:12 PM
Creation date
5/16/2011 1:42:36 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Tamarack Contract and Supporting Docs
State
CO
NE
Basin
South Platte
Water Division
1
Date
11/18/1999
Title
Tamarack Contract and Supporting Docs
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW THEREFORE, it is hereby agreed that <br />Northern Colorado Water Conservancy District Shall <br />A Provide, at its cost, administrative, supervisory, procurement, engineering and <br />oversight services for the construction projects described in Exhibit A <br />B Procure equipment, materials, and other similar items for the construction projects <br />described in Exhibit A, using the funds provided by the State under the terms of <br />this agreement Except for the provision of services by NCWCD personnel as <br />described in paragraph 1 A above, the NCWCD shall not be required to expend <br />fiind -z nr recrnirrec in the nerfnrmanr.e of thic agreement exnent fnr the fiinrlc <br />provided by the State under the terms of this agreement <br />C Coordinate and cooperate with the State as necessary, or when requested by the <br />State, before, during, and after project delivery <br />E Provide reports to the State by June 30, 1998 and every three months thereafter if <br />the contract is extended, with a final report due upon completion of the project <br />work Such reports shall indicate whether the projects are on schedule, if any <br />projects have been modified, and the nature of the modifications, any changes in <br />the distribution of funds, the amount of funds expended to date by project, and <br />other information as shall be reasonably requested by the Project Leader <br />F Maintain a complete file of all records, documents, communications, and other <br />written materials which pertain to the completion of the projects and the delivery <br />of services under this contract, including but not limited to receipt and expenditure <br />of funds and its provision of services, and shall maintain such records for a period <br />of three (3) years after the date of termination of this contract or final payment <br />hereunder, whichever is later <br />G When procuring goods and services from third persons in connection with the <br />performance of this contract, comply to the extent practicable with the <br />requirements of the Colorado Procurement Code and regulations and rules <br />promulgated thereunder Reference Articles 101 through 112 of Title 24, C R S , <br />and rules promulgated thereunder (1 C C R 101 -9), including requiring such third <br />persons to secure and provide evidence of having secured performance bonds for <br />any capital construction in excess of fifty thousand dollars (References Section <br />38 -26 -106, C R S ) <br />2 The State Shall <br />A Provide up to $25,000 00 in cost sharing toward the projects described in Exhibit <br />A <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.