Laserfiche WebLink
2 <br />■ Budget: 100% Task: 98% (Zama A . �s q 7 <br />o Schedule: Vulnerability Assessment Methodology Complete and description <br />delivered to CWCB with Draft Plan document; <br />o Issues: No issues at this time <br />* Task 4 Track Local Drought Plan Info <br />• Write -up of approach to track local plan information; <br />• Budget and Task progress: 3a <br />■ Budget: 93% Task: 85% fZ-e_m A-LO . 1088 <br />o Schedule: Section nearly complete — estimated 6 <br />o Issues: Issues and schedule to be discussed with CWCB on 07/30/2010 <br />Task 6 Analysis of Adaptive Capacity <br />• Formalize analysis of adaptive capacities; <br />• Write -up adaptive capacity measures and integrate into Vulnerability Assessment <br />report and Draft Plan; <br />• Budget and Task progress: <br />■ Budget: 99% Task: 100% <br />• Schedule: Draft report and Plan sections delivered; <br />• Issues: No issues at this time <br />Task 6 Mitigation Strategy Recommendations <br />• Recommendations completed; <br />• Budget and Task progress: <br />■ Budget: 99% Task: 100 %� a <br />• Schedule: Recommendations complete and incorporated into Vulnerability <br />Assessment and Draft Plan document; <br />• Issues: No issues at this time <br />* Task 7 Web Ready Electronic Files <br />• internal meeting to discuss generation and formats of text and graphics for web <br />publication; <br />■ Budget: 26% Task: 55% P,4-vra -L n <br />• Schedule: Files organized for delivery, a few still requiring organization (primarily <br />pairing down); <br />• Issues: Schedule to be discussed with CWCB on 07/30/2010 <br />Milestones Completed Summary: <br />* Prepared for and presented at two meetings to highlight drought vulnerability <br />assessment work and define climate change work; <br />* Completed and delivered draft sections describing Drought Vulnerability Study and <br />sections for inclusion in draft Drought Plan; <br />Planned and Anticipated Meetings Summary: <br />