My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO 2010 Drought Mitigation & Response Plan March 2010 Prog Reports
CWCB
>
Grants
>
DayForward
>
CO 2010 Drought Mitigation & Response Plan March 2010 Prog Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 3:51:36 PM
Creation date
3/31/2011 3:51:41 PM
Metadata
Fields
Template:
Grants
Applicant
AMEC Earth & Environmental Inc.
Grant Type
Non-Reimbursable
Severance Tax
Fiscal Year (i.e. 2008)
2009
Project Name
Update to Colorado Drought Mitigation & Response Plan
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
C154152
Grants - Doc Type
Supporting Documentation
Document Relationships
CO 2010 Drought Mitigation & Response Plan Contract
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan Invoices
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan SOW
(Attachment)
Path:
\Grants\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />• Deadline comment request from entities —June 1st <br />• Draft Guidance Document to CWCB for final review — June 3 <br />• Comments back from CWCB - June 7 <br />• Final Guidance Document - June 11 <br />Milestones Completed Summary: <br />* Drought Mitigation and Response Committee Meeting #3 —April 30 9 -1:00 <br />* Local Plan Guidance Document Workshop and Draft Manual <br />Planned and Anticipated Meetings Summary: <br />* Regular coordination meetings 2 nd Tuesday of each month- May 11th next meeting <br />* CWCB board presentation May 19 <br />* Possible participation in May 13 Hazard Mitigation Plan Update meeting and May 21 <br />WATF meeting <br />Schedule: AMEC is on schedule with project tasks; Overall budget is 56% complete, and a <br />significant push will be made in May and June to complete the first entire draft that will be made <br />available for the DMRPC review targeting June 15th. <br />Concerns, Complications or Assistance Requested: Will develop a cost to complete for task <br />6; No other problems at present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.