My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO 2010 Drought Mitigation & Response Plan March 2010 Prog Reports
CWCB
>
Grants
>
DayForward
>
CO 2010 Drought Mitigation & Response Plan March 2010 Prog Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 3:51:36 PM
Creation date
3/31/2011 3:51:41 PM
Metadata
Fields
Template:
Grants
Applicant
AMEC Earth & Environmental Inc.
Grant Type
Non-Reimbursable
Severance Tax
Fiscal Year (i.e. 2008)
2009
Project Name
Update to Colorado Drought Mitigation & Response Plan
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
C154152
Grants - Doc Type
Supporting Documentation
Document Relationships
CO 2010 Drought Mitigation & Response Plan Contract
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan Invoices
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan SOW
(Attachment)
Path:
\Grants\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />* <br />* <br />• Developed list of recommendations for new mitigation action strategies along <br />with suggestions for continuing or changing existing action strategies <br />• Compiled list of typical drought mitigation tools for states for reference at the April <br />30 meeting <br />• Completed revision /update /consolidation of state drought management <br />capabilities <br />• Developed memo regarding response element enhancements /changes for <br />CWCB <br />• Percent complete: <br />■ Budget: 64% Task: 64% <br />• Schedule: On schedule for June 15 1 St draft. Triggers and indices update and <br />integration may lag based on CCC and NRCS work. <br />• Upcoming activities or needs: <br />• Develop text for mitigation and capabilities assessment portion of plan <br />• Develop and distribute memo regarding response ITF changes for <br />DMRPC <br />• Developed draft revised response annex <br />Task 5 Draft Plan <br />• Reviewed local hazard mitigation plans and extracted relevant information <br />regarding capabilities and vulnerabilities <br />• Researched USDA declarations and received information from the FSA to update <br />hazard history section <br />• Includes project management, project review, monthly progress reports for <br />CWCB <br />• Percent complete <br />■ Budget: 22% Task: 25% <br />• Schedule: On schedule for June 15 1 draft. <br />• Upcoming activities or needs: <br />• Status report presentation for CWCB Board scheduled May 19 <br />• Continued development of draft plan including merging of information <br />from recent meetings and description of the planning process <br />Task 6 Drought Resources Development/implementation Tools <br />• Facilitated workshop with local water providers on April 7th <br />• Integrated feedback from entities on Guidance Document workshop materials <br />• Draft Local Plan Guidance Document submitted to CWCB on May 5th <br />• Percent complete <br />• Budget: 79% Task: 60% <br />* Guidance Document in good shape but work on other toolbox <br />content remains and may need to shift budget from other tasks in <br />f uture. <br />• Schedule: <br />* On schedule for June 11 completion of guidance document. <br />* Draft toolbox by June 30th to coincide with public review draft of <br />Plan. <br />o Upcoming activities or needs: <br />• Comments back from CWCB - May 11 <br />• Draft Guidance Document to entities for review - May 18th <br />
The URL can be used to link to this page
Your browser does not support the video tag.