My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brighton_WaterAudit_75%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Brighton_WaterAudit_75%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:24:55 PM
Creation date
3/14/2011 1:10:33 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 10-77
Applicant
City of Brighton
Project Name
Water Audit
Title
75% Progress Report
Date
2/24/2011
County
Adams
Weld
Water Efficiency - Doc Type
Interim Reports
Document Relationships
Brighton 2008 WCPlan
(Attachment)
Path:
\Water Conservation\DayForward
Brighton_WaterAudit_50%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_FinalReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_Invoice
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Major Findings <br />The results of the project support the understanding that audits can be used to identify customers that <br />can benefit from installing high- efficiency water fixtures to save water and energy. The audits further <br />support identifying those locations that are the most cost - effective for retrofits. <br />The results of the water savings associated with the retrofits that were installed have not yet been <br />determined, but will be within the next 4 weeks. <br />Steps Remaining <br />The City has collected water use data for those locations where installations were completed. These <br />data were collected for 8 months and are being used to inform the draft report which is currently being <br />prepared. The final report is currently expected to be produced in late March this year. <br />Thank you for all your support in the planning and implementation of our water conservation program. <br />Our community has benefited greatly from the funding and technical assistance provided by the CWCB <br />throughout the past several years. <br />Should you have any questions please do not hesitate to contact me. <br />Respectfully, <br />4 , // - / ", <br />Dawn M. Hessheimer <br />Water Resources Specialist <br />Cc: Tracy Bouvette, Great Western Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.