Laserfiche WebLink
' <br />' <br />' <br />' <br />' <br />' <br />' <br />' <br />� <br />' <br />' <br />, <br />' <br />' <br />' <br />II <br />� <br />� <br />Table 2 <br />Stagestop Dam Rehabilitation Project <br />Lower Reservoir <br />Item Descri tion Unit Quantit Unit Price Total <br />CONSTRUCTION <br />1 Silt Fencin LF 100 $ 5.00 $ 500.00 <br />2 Erosion Control Blanket SF 2000 $ 3.00 $ 6,000.00 <br />3 Site Demolition with Haul LS 1$ 2,500.00 $ 2,500.00 <br />Existin fencin <br />Existin culverts <br />Existin valve <br />4 Dam Excavation CY 800 $ 5.00 $ 4,000.00 <br />5 Dam Embankment CY 800 $ 7.00 $ 5,600.00 <br />Perforated Intake Pipe with Stainless <br />6 Steel Sc�eens EA 1$ 3,500.00 $ 3,500.00 <br />7 Outlet Structures with Sto lo s EA 1$ 4,500.00 $ 4,500.00 <br />8 18" Outlet Culvert LF 50 $ 125.00 $ 6,250.00 <br />9 Ri ra S illwa with Fabric CY 30 $ 70.00 $ 2,100.00 <br />10 Embankment Geo rid SY 2000 $ 3.00 $ 6,000.00 <br />11 Toe Drain with Gravel LF 50 $ 60.00 $ 3,000.00 <br />12 Concrete Pads 1 CY 3$ 750.00 $ 2,250.00 <br />13 Ri ra at New Inlet with Fabric CY 40 $ 70.00 $ 2,800.00 <br />14 Re rade Pond Bottom SF 3000 $ 0.50 $ 1,500.00 <br />1�5 To soil Remove 8" CY 150 $ 5.00 $ 750.00 <br />16 Sand Collar Filter EA 1$ 3,000.00 $ 3,000.00 <br />17 Reve etation AC 0.35 $ 7,500.00 $ 2,625.00 <br />18 Re lace To soil CY 50 $ 5.00 $ 250.00 <br />19 24" CMP w/FES 2 LF 45 $ 60.00 $ 2,700.00 <br />20 Im ort Structural CY 100 $ 60.00 $ 6,000.00 <br />Subtotal Construction Services $ 65,825.00 <br />22 Contin enc 10% $ 6,582.50 <br />Total Construction Services $ 72,407.50 <br />PROFESSIONAL SERVICES <br />1 Desi n En ineerin LS 1$ 6,000.00 $ 6,000.00 <br />2 Geotechnical En ineerin LS 1$ 4,000.00 $ 4,000.00 <br />3 Construction Mana ement LS 1$ 2,000.00 $ 2,000.00 <br />Total Professional Services $ 12,000.00 <br />GRAND TOTAL $ 84,407.50 <br />' Stagestop Augmentation Reservoirs <br />Rehabilitation Feasibility Study <br />May 2010 <br />' <br />