Laserfiche WebLink
' <br />' <br />, <br />' <br />� <br />' <br />' <br />' <br />' <br />, <br />L� <br />, <br />� <br />� <br />1 <br />�J <br />' <br />Table 1 <br />Stagestop Dam Rehabilitation Project <br />Upper Reservoir <br />Item Descri tion Unit Quantit Unit Price Total <br />CONSTRUCTION <br />1 Mobilization LS 1$ 10,000.00 $ 10,000.00 <br />2 Dewaterin LS 1$ 7,500.00 $ 7,500.00 <br />3 Silt Fencin LF 120 $ 5.00 $ 600.00 <br />4 Erosion Control Blanket SF 2000 $ 3.00 $ 6,000.00 <br />5 Site Demolition with Haul LS 1$ 3,500.00 $ 3,500.00 <br />Existin fencin <br />Existin culverts <br />Existin cinder-block structures <br />Existin valve <br />6 Dam Excavation CY 1000 $ 5.00 $ 5,000.00 <br />7 Dam Embankment CY 1000 $ 7.00 $ 7,000.00 <br />Perforated Intake Pipe with Stainless <br />8 Steel Screens EA 1$ 3,500.00 $ 3,500.00 <br />9 Outlet Structures with Sto lo s EA 1$ 5,000.00 $ 5,000.00 <br />10 18" Outlet Culvert LF 88 $ 125.00 $ 11,000.00 <br />11 Ri ra S illwa with Fabric CY 30 $ 70.00 $ 2,100.00 <br />12 Embankment Geo rid SY 2000 $ 3.00 $ 6,000.00 <br />13 Toe Drain with Gravel LF 50 $ 60.00 $ 3,000.00 <br />14 Concrete Pads 1 CY 3$ 750.00 $ 2,250.00 <br />15 Ri ra at New Inlet with Fabric CY 40 $ 70.00 $ 2,800.00 <br />16 Re rade Pond Bottom SF 4000 $ 0.50 $ 2,000.00 <br />17 To soil Remove 8" CY 200 $ 5.00 $ 1,000.00 <br />18 Reservoir Crest Reconstruction SF 2800 $ 2.00 $ 5,600.00 <br />19 Sand Collar Filter EA 1$ 3,000.00 $ 3,000.00 <br />20 Reve etation AC 0.35 $ 7,500.00 $ 2,625.00 <br />21 Re lace To soil CY 50 $ 5.00 $ 250.00 <br />22 Im ort Structural Fill CY 150 $ 60.00 $ 9,000.00 <br />Subtotal Construction Services $ 98,725.00 <br />23 Contin enc $ 9,872•5a <br />Total Construction Services $ 108,597.50 <br />PROFESSIONAL SERVICES <br />1 Desi n En ineerin LS 1$ 12,760.00 $ 12,760.00 <br />2 Geotechnical En ineerin LS 1$ 4,000.00 $ 4,000.00 <br />3 Construction Mana ement LS 1$ 2,000.00 $ 2,000.00 <br />Total Professional Services $ 18,760.00 <br />GRAND TOTAL $ 127,357.50 <br />, Stagestop Augmentation Reservoirs <br />Rehabilitation Feasibility Study <br />May 2010 <br />II <br />� <br />