My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150194 feasiibility study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150194 feasiibility study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:11:07 PM
Creation date
7/23/2010 12:28:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150194
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
2
County
Adams
Morgan
Weld
Bill Number
SB 05-084
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.2 Credit AUotted to Water Sources <br />Projected direct flow sources are shown in Table 6. All reusable effluent sowces will be credited <br />at 100 percent of delivery. Conveyance of augmentation well water will be charged a 10 percent <br />delivery charge by the conveying ditch company. Table 6 shows the total augmentation well <br />pumping required to cover potential out-of-priority depletions and the 10 percent conveyance <br />payment. <br />5.3 Frequ�cy of Reporting <br />Reporting of Central's operation of the WAS SWSP for the period April l, 2004 through <br />March 31, 2005 will be d�e on a mont�ly basis. Accounting for the plan will be done on a daily <br />basis, and all accountir►g for the past month's operatian will be completed in the first week of the <br />following month, providing weal�er and diversian data can be obtained in a timely fashion. <br />Reports will be mailed to the Division Engineer in Greeley at the e�d of the first week of the <br />following mo�th. <br />Each mont�ly report prepazed for the Division Engineer will be completed on a form similaz to <br />the forms contain�l in Appendix F and acceptable to the Division 1 Engineer. Each form will <br />contain inforn�arion for one calendar month. Forn�s will be organized by reach, and sources will <br />be grouped according to the type of supply. Each form will show the total replacement supply <br />on a daily and year-to-date basis, as well as the total out of priority depletions replacement <br />requirement, as indic,ated by daily river call inforn�ation <br />6A S�Y OF WAS 2004 SWSP <br />Table 6 presents the estimated April 1, 2004 through March 31, 2005 monthly depletions for <br />Ceniral's WAS member wells and t�e replacement sources wlrich will be used to replace out of <br />priority depletions. All appropriate monthly retum flow obligations for each replacement source <br />aze also contained in Table 6 and included as a replacement obligation where appropri�te. <br />In snmmary, The WAS portfolio of replacement saurces is suffiaent to replace all out of priority <br />depletions within each reacl� expected to occur diuing the period of April l, 2004 through <br />March 31, 2005. Any deficit in depletions replacement will be filled with bypass flows and <br />augmentation well pumping, as indicated in Table 6. Winter depl�ions will be replaced with <br />augmentation well pumping if it is deternuned that senior reservoirs in Division 1 will not fill by <br />the end of the winter fill period (approximately Apri130, 2004). <br />Nots �at the momi�ly depletions and net river impacts shown in Table 6 are deterinined based on <br />estimated depletions and the assumption that a senior priority call will be on for the entire period <br />of Apri12004 through March 2005. Daily accounting will be prepared and submitted on a <br />mont�ily basis tfiat will indicate out of priority depletions based on priority ca11s for the reporting <br />month. <br />P:\Data\GEN\CCWCD\�187\SWSP WAS\�4 WAS SWSP (FINAL).doc 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.