Laserfiche WebLink
3. Meet informally with Mr. Clay and other interested parties to review the primary conclusions of <br />this report and compare key aspects of the two studies including conveyance alignments (lengths <br />and costs), OMID operations and representation in the CDSS model, potential environmental <br />constraints, and local water user needs. <br />Any future investigations into the Grand Valley Lake should more fully consider environmental and <br />permitting factors prior to further technical and cost analysis of the project. <br />0 <br />AECOM <br />2/22/10 <br />