Laserfiche WebLink
Table E3. Comparison of Options <br />O tion Positive As ects Ne ative As ects <br />• Low unit storage cost • High land acquisitions cosUissues <br />• Gravity-fed conveyance does not require • Potential constructability issues due to <br />1 A um in conve ance eolo <br />• Low unit storage cost • High land acquisitio�s cost/issues <br />• Gravity-fed conveyance does not require • Potential constructability issues due to <br />1 B um in convevance eolo <br />• Low unit starage cost (cost is slightly lower • Greenhouse gas emissions from pumping <br />than Options 1 A and 1 B, but are considered • Uncertainty of future operating costs due to <br />equal based on this preliminary level of study) potential escalation in the price of pumping <br />• ShoR conveyance distance (less land acquisition energy. <br />cost/issues) <br />• No impacts to water quality or flow through <br />Dominguez-Escalante National Recreation Area <br />1C since diversion int is downstream <br />• Gravity-fed conveyance does not require • High unit storage cost <br />pumping • High land acquisitions cost/issues <br />• Potentiaf constructability issues due to <br />2A conve �ance eolo � <br />• Gravity-fed conveyance does not require • High unit storage cost <br />pumping • High land acquisitions cost/issues <br />• Potentia] constructability issues due to <br />2B conve ance eolo � <br />• Short conveyance distance Qess land acquisition • High unit storage cost <br />cost/issues) • Greenhouse gases from pumping <br />• No impacts to water quality or flow through . Uncertainty of future operating costs due to <br />Dominguez-Escalante National Recreation Area potential escalation in the price of pumping <br />2C since diversion point is downstream ener <br />Recommendations <br />Without strong indication of support for further analysis and demonstrative need for the project output, <br />postpone further State investigation indefinitely it is recommended that no further action be taken. If the <br />specific need and funding source for the project are identified, the following procedural steps are <br />recommended for any potential future investigations of the Grand Valley Lake Project: <br />]. Meet informally with state and federal agency personnel familiar with the latest details of land <br />management and environmental programs including Aspinall Unit operations and programs in <br />the Gunnison and Colorado Rivers upstream of their confluence at Grand Junction to confirm the <br />general accuracy and appropriateness of the preliminary information presented herein. <br />Consider revisions or additional scenarios as appropriate to alter the assumptions on project yield <br />allocated to environmental purposes and clarify current understandings of the status of the <br />endangered species programs on the Colorado and on the Gunnison Rivers. <br />AECOM <br />2/22/10 <br />' <br />, <br />' <br />' I <br />�I <br />' I <br />t I <br />