My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154141 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C154141 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 1:43:04 PM
Creation date
7/16/2010 11:53:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154141
Contractor Name
AECOM USA, Inc.
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I. Introduction <br />A presentation of a potential "Grand Valley Lake" (GVL) project was made to the Colorado Water <br />Conservation Board (CWCB) in September 2007. Subsequent to that presentation, the Redlands Water <br />and Power Company (Redlands) and the Orchard Mesa Irrigation District (OMID) made a joint request <br />to the CWCB for a comprehensive study of the feasibility of the project. Project information, including <br />letters of support for the study from the two study sponsors, was provided to the CWCB in a document <br />titled "Potential Grand Valley Lake Study" that was compiled by Donald E. Clay Professional Engineers <br />and Associates [Clay, 2007]. This supporting information is referred to below as the "Clay Report". lt <br />contains preliminary information for a new dam and reservoir south of the Colorado River, between the <br />towns of Grand Junction and Palisade, Colorado described as follows: <br />"This plan would divert about 300 cfs of water from the Gunnison River via� 50 — 60 miles of <br />canal and tunnels. The aqueduct would provide an average annual water supply of 178,000 acre- <br />feet to the potential Grand Valley Lake (Reservoir) for use in the Grand Valley and surrounding <br />areas. The off stream lake would [have] a surface area of about 1,500 — 2,000 acres." <br />Information presented in the Clay Report at varying levels of detail includes: <br />• Preliminary Cost Estimates and Layouts <br />• Site Geology <br />• Hydrology <br />• Water <br />• Quality <br />• Water Rights <br />• Economics <br />The Information in the Clay Report was used herein to facilitate apple-to-apples comparisons to the <br />extent possible <br />This report examines two reservoir sizes (with corresponding variations in dam alignments) and three <br />conveyance alignments. Reservoir yield analyses were prepared for the two reservoir capacities. <br />Preliminary assessments of probable construction costs were prepared for each combination of <br />conveyance alternatives and dam alignments. The report concludes with a preliminary identification of <br />potential environmental issues. Figure 1 shows the locations of the two dam alignments and the three <br />conveyances and the diversion locations for the conveyances. <br />Information for this conceptual analysis was obtained from readily available public sources including: <br />• Colorado Water Conservation Board (CWCB) <br />• Colorado Office of the State Engineer (SEO) <br />10 <br />AECOM <br />2/22/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.