My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150244 feas study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150244 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:11:06 AM
Creation date
7/8/2010 1:53:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150244
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />' <br />' <br />' <br />C' <br />' <br />' <br />' <br />l�J <br />�_ .� <br />' <br />' <br />' <br />� <br />� <br />,.,I <br />' <br />' <br />' <br />' <br />TABLE 2 <br />ANGEL LAKE <br />ALTERNATIVE 2 - Repair Outlet <br />UNIT <br />ITEM DESCRIPTION QUANTITY UNITS PRICE SUBTOTALS AMOUNT <br />1. Insurance, Bonds, Mobilization 1 L.S. $ 4,730.00 $ 4,800 $ 4,800 <br />2. Insituform Coating of Outlet pipe 1 L.S. $ 43,500.00 $ 43,500 $ 43,500 <br />3. Site Access and prep/dewatering 1 L.S. $ 5,000.00 $ 5,000 $ 5,000 <br />4. Replace Service Spillway $ 41,900 <br />a. Grout Existing Line 7 C.Y. $ 650.00 $ 4,600 <br />b. Jack 30" Steel Pipe Under Roadway 60 L.F. $ 350.00 $ 21,000 <br />c. Concrete Inlet Structure 5 C.Y. $ 550.00 $ 2,800 <br />d. 30" Steel Pipe Downstream of Jacked Pipe 50 L.F. $ 150.00 $ 7,500 <br />e. Excavation, Backfill, Demolition Existing Inlet 1 L.S. $ 5,000.00 $ 5,000 <br />f. Riprap 25 Tons $ 25.00 $ 700 <br />g. Bedding 12 Tons $ 20.00 $ 300 <br />5. Site Access and prep/dewatering 1 L.S. $ 5,000.00 $ 5,000 $ 5,000 <br />6. Traffic Signage/Lane Closure 1 L.S. $ 6,000.00 $ 6,000 $ 6,000 <br />7. Outlet Structure $ 11,700 <br />a. Concrete 5 C.Y. $ 550.00 $ 2,800 <br />b. Riprap 290 Tons $ 25.00 $ 7,300 <br />c. Bedding 80 Tons $ 20.00 $ 1,600 <br />8. Refurbish Gate Tower Concrete 1 L.S. $ 5,000.00 $ 5,000 $ 5,000 <br />TOTAL CONSTRUCTION COST $ 123,000 <br />CONTINGENCY(15%) $ 19,000 <br />ENGINEERING/LEGAUSURVEYING $ 20,000 <br />TOTAL $ 162,000 <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.