My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150271 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150271 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:25:06 AM
Creation date
7/8/2010 11:32:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150271
Contractor Name
WRCC, Inc.
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Security <br />Agreement, in the form attached as Appendix 4 and incorporated herein, shall be a <br />pledge of Borrower's assessment revenues backed by a rate covenant ("Collateral"). <br />SECTION 7— ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />Borrower will pay off the bridge loan with Farmers Bank referenced in Section 5 <br />above. <br />SECTION $— CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECT. <br />B. The BORROWER and the Engineering ConsultanYs Agreements and the plans <br />and specifications must be submitted to the CWCB staff for verification of <br />compliance with the terms of this Contract when available prior to bidding. Any <br />modifications to the plans and specifications must be approved in writing by the <br />CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by § 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROwER shall contract for the construction of the work with responsible <br />and capable Construction Firms, which said Construction Firms shall be selected <br />by the BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />perFormance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER ShBll conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector <br />during construction, the BORROWER Shall employ an inspector who has been <br />approved by the CWCB staff. <br />The BoRROWER shall Construct the PROJECT in accordance with the approved <br />plans and specifications. <br />Appendix 1 to Loan Contract C150271 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.