Laserfiche WebLink
J. Upon completion of the PROJECT construction, the BORROWER Shall pl"OVId2 aS- <br />built drawings of the PRO�ECT to the CWCB staff, or, if required by § 37-87-105, <br />C.R.S., the BoRROwER shall provide the as-built drawings to the State Engineer's <br />Office for approval and filing. <br />K. Upon completion of the PRO�ECT construction, the BoRROwER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BoRROwER shall pay all of the expenses related to the PRO�ECT when such <br />bills are due. <br />SECTION 9— ELIGIBLE EXPENSES The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PRO�ECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BoRROwER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion Of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />Contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br />M. PRO�ECT-related expenses incurred prior to the Effective Date of this contract in <br />accordance with the approval of this loan. <br />J. Pay off existing loan to Farmers Bank of Ault. <br />1 O - DISBURSEMENT SCHEDULE <br />For Project costs: The BoRROwER shall prepare a periodic progress report which <br />contains a statement of the PRO�ECT costs expended for that period and shall <br />forward said statement to the CWCB. After receipt of the periodic progress report <br />from the BORROwER and review and acceptance of the items therein as eligible <br />expenses as described below, the CWCB will pay to the BoRROwER the amount <br />set forth in the report or such portion that has been approved by the CWCB. <br />Such payment shall be made within thirty (30) days from the CWCB's approval of <br />each progress report. <br />For loan payoffs: For loan disbursements to payoff existing debt described in <br />Appendix 1 to Loan Contract C150271 <br />Page 3 of 4 <br />