My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150271 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150271 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:25:06 AM
Creation date
7/8/2010 11:32:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150271
Contractor Name
WRCC, Inc.
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary - WRCC, Inc. - Contract No. C150271 <br />SECTION 1 —BORROWER INFORMATION <br />Name: WRCC, Inc. <br />Address: 106 Elm Avenue, Eaton, CO 80615 <br />Contact: Mayo Sommermeyer, General Counsel <br />Phone Number: 970-420-9975 <br />E-mail address: Iwirrigation@aol.com <br />Type of Entity: a Colorado nonprofit corporation <br />Section 2 — Project Description <br />A. Description of PRO�ECT: The BoRROwER applied to the CWCB for a loan to be <br />used for the construction of the Big Windsor Dam and Spillway Maintenance <br />Project, located in Larimer County, hereinafter referred to as the PRO�ECT, at an <br />estimated total cost of $1,413,600. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br />report on the PROJECT entitled "Feasibility of Windsor Dam and Spillway <br />Maintenance Project," dated August 2008, compiled by Mayo Sommermeyer and <br />John Andrew, which is incorporated herein by reference, and, based upon the <br />feasibility report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Severance Tax Trust Fund Perpetual Base Account• This loan is made pursuant <br />to the provisions of §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, <br />provided that the borrower assures repayment of that money. <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL <br />At its September 2008 meeting, the CWCB approved a Small Project Loan from the <br />Severance Tax Trust Fund Perpetual Base Account to the BoRROwER in an amount up to <br />$1,273 for PROJECT costs not to exceed 90% of the cost of the PRO�ECT, with a loan <br />origination fee of 1% in accordance with CWCB Policy No. 16, at an interest rate of 2.55% <br />per annum for a repayment term of 30 years. <br />SECTION 5— SCHEDULE OF EXISTING DEBT <br />$500,000 bridge line of credit from Farmers Bank in Ault, Colorado, at an interest rate <br />of 5.0% per annum. <br />Appendix 1 to Loan Contract C150271 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.