My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150050 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150050 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 8:24:18 AM
Creation date
7/2/2010 12:22:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150050
Contractor Name
Mesa County Board of County Commissioners
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />�� <br />ENGINEER shall provide COUNTY with copies of the draft and final reports prepared under <br />the various segments of this AGREEMENT. Specifically, as a minimum, ENGINEER shall <br />provide copies of the following reports: <br />Report Conies <br />Draft dra.ina.ge 4 <br />Final drainage 4 <br />Draft preliminary design 4 <br />Final preliminary design 4 <br />Draft 12 <br />Final 12 <br />4. PERSONNEL <br />ENGINEER represents that it will use as a minimum the following personnel in perfomung <br />the services under this AGREEMENT: <br />Name Responsibilitv <br />Principal-In-Charge <br />i'roject Manager <br />Project Engineer <br />Changes in the above personnel may not be made. If conditions beyond the control of <br />ENGINEER develop, changes in above personnel may be made only upon advance written <br />approval by COLTNTY. <br />S. TIME OF PERFORMANCE <br />Item 2.A. of the SCOPE OF SERVICES shall be completed and the draft drainage repor� <br />submitted to COtTNTY within 4� calendar days following receipt of copies of mapping and <br />Notice to Proceed. <br />COUN1"Y and LOCAL SPONSORS shall have 14 calendar days to review the draft drainage <br />report and submit comments to ENGINEER, who shall then have 21 calendaz days to submit <br />final report to COUNTY. <br />COIJNTY and LOCAL SPONSORS shall have, after receipt of the final drainage reports, 14 <br />calendar days to consider the drainage recommendations, select the alternate for further study <br />during preliminary design, and to issue a Notice to Proceed into preliminary design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.