My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150050 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150050 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 8:24:18 AM
Creation date
7/2/2010 12:22:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150050
Contractor Name
Mesa County Board of County Commissioners
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />� <br />Item 2.B. of the SCOPE OF SERVICES shall be completed and the draft preliminary design <br />report submitted to COUNTY within 30 calendar days following the Notice to Proceed with <br />any one alternate. <br />COLTNTY and LOCAL SPONSORS shall have 14 ca.lendar days to review the drafr <br />preliminary design report and submit comments to ENGINEER who shall then have 30 <br />calendar davs to submit the final reports to COIJNTY. <br />Item 2.C. of the SCOPE OF SERVICES shall be completed and a copy of the draf� report <br />submitted to CO[JNTY and LOCAL SPONSORS within 21 calendar days of the receipt of <br />the copies of mapping. COUNTY and LOCAL SPONSORS shall have 14 calendar days to <br />review the draft and submit comments to ENGINEEI� who shall then have 21 calendar days <br />to submit the final reports to COUNTY. <br />6. FORMAL PRESENTATTONS <br />ENGINEER shall make the following numbers of formal presentations at public, CiTy Council <br />or County Commissioner meetings or hearings in connection with drainage and preliminary <br />design as scheduled by COUNTY: <br />Number Formal <br />Phase Presentations <br />Master Plan/Preliminary Design 1 <br />Floodplain Delineation <br />In addition, ENGINEER will meet informally at COUNTY request. ENGINEER will be <br />reimbursed on a"cost plus" basis for additional formal presenta.tions, which compensation <br />shall not exceed the wa.ges paid in connection with the additional formal presentations, times a <br />factor of 2.6, plus all direct expenses. <br />7. REPORT DISTRIBUTION <br />COUNT'Y will be responsible for furnishing LOCAL SPONSORS with copies of the various <br />reports prepared b�� ENGINEER: <br />8. COMPENSATION <br />COUNTY agrees to pay ENGINEER <br />Dollars <br />($ ) for all of the above services subject to the terms and conditions described <br />under Paragraphs 10 and 14 below. <br />9. RESPONSIBILITIES OF ENGINEER <br />ENGINEER shall be responsible for providing services in accordance with Section 2. SCOPE <br />OF SERVICES and all other terms and conditions specified in this Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.