My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150227 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2011 1:22:31 PM
Creation date
6/29/2010 3:32:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150227
Contractor Name
South Platte Ditch Company
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />PHASE iii Tasks Control <br />• <br />1. Motorize gate at SPDC company lateral headworks and automate to maintain <br />target discharge across lateral entrance flume <br />2. Develop flow measurement capability for flows in the SPDC main canal <br />passing the company lateral bifurcation. (Both Phase III tasks 1& 2 will be <br />controlled/monitored by radio/control equipment installed in Phase II to <br />monitor flow at the head of the company lateral) <br />3. Instal� radio unit at the SPDC river diversion structure to enable remote <br />adjustment of overshot gates on the dam and at the canal entrance. <br />4. ** Install radio/cont�ol units @ 3n group of J&E SH sites (5 total) <br />5. Continued development of spreadsheet-based data management tool. <br />6. Organize and host third annual field day <br />7. Prepare Project Final Report <br />8. Review Report and post on WSBR Website & provide hard copies to CWCB, <br />CDWR, and LSPWCD. <br />"`* Indicates optional task that may be substituted for as a part of the annual <br />review process, with substitute tasks provided as approved by the CWCB <br />Staff. <br />Deliverables <br />The Project Final Report will include the following: <br />1. Implementation of each project task will be chronicled, including details of the <br />approach employed, of issues encountered and of actions that were taken in <br />response to the various issues. <br />2. A data base documenting the performance of the various electronic instruments <br />deployed in the project will be compiled as a tool for others to determine what <br />might be appropriate and reliable components for similar systems. <br />3. All control system programming and data management tools developed in a <br />spread-sheet environment will be available from the USBR Hydraulic <br />Investigations and Laboratory Group website. Simplified accessibility will be <br />available via links written into the electronic version of the Project Final Report <br />which will also be avaitable from the same website. <br />4. Interim project reviews, which will be conducted as both Phase I and Phase II <br />tasks are nearing completion will be included in the Appendices of the Final <br />Report <br />5. A pre-project and post-project assessment of capabilities of the participating <br />companies will be compiled to provide a sense of how each entity feels the <br />Project has enhanced operations, and how each entity feels they might move <br />beyond the demonstration scope of this project in the future. <br />Appendix B to Grant Contract No. C150227 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.