Laserfiche WebLink
PROJECT SCHEDULE <br />Phase I Monitoring and Base Setup <br />Task 1— Install recorders @ J&E recharge ponds <br />Task 2—Construct new flume at G2 site <br />Task 3—Instali radio/control ur�its at SPDC office and recharge sites <br />Task 4— Instatl I radio/control units on first group J&E SH wells (4 wells) <br />Task 5—Install radio/control units on J&E SH (FLG) recharge pond and office <br />Task 6— lnstall radio/control un�ts � DWR designated office site <br />Task 7—Link radio/control unit @ SPDC upper flurne to Kautz lift pump <br />Task 8— tnitial developrr�nt of spreadsheet-based Data AAanagement tool <br />Task 9— Organize and host field day <br />Task 10 — Conduct and documen! interim project review <br />Phase 11 Mon�torins� and Control <br />Task 1— Matorize/automate gates on SPDC spiltway near main flume <br />Task 2— fnstall ramp in concrete section � entraryc�e to SPDC Smith#3 recharge pond <br />Task 3— Instail weir blades on check-weir � entrance to SPDC Sandhill recharge pond <br />Task 4—**Instalt radio/cantrol uniis on 2"� group of J&E SH wells (3 wells) <br />Task 5— Install radio/corrtrol units on SPDC company lateral flumes <br />Task 6— Development and modification of spreadsheet-based Data Management tool <br />Task 7— Organize and host field day <br />Task 8— Conduct and documerrt interim project review <br />Phase III Control <br />Task 1— Motorize/automate gate @ SPDC comp�y latera! headworks <br />Task 2— In-canal measurement for flows passing SPDC campany lateral bifurcation <br />Task 3— install radio/control unit @ SPDC river diversion strudure <br />Task 4—** Install readio/control units @ 3�`' group of J&E SH wells (5 sites) <br />Task 5— Development and modification of spreadsheet-based Date Management tool <br />Task 6— Organize and host field day <br />Task 7— Prepare Project Final Report <br />Task 8— Review Report and post on USBR Website <br />Start <br />06/01 /07 <br />06/01/07 <br />06/01f07 <br />06/01l07 <br />06/01f07 <br />06/01/07 <br />07/01/07 <br />o7roa�a7 <br />U8/01/07 <br />t}9/01/07 <br />07/01/07 <br />Q7/01/07 <br />Q7/0'�/07 <br />oaia�io7 <br />oaio��o7 <br />07/41/08 <br />t?8/01/Q8 <br />09/01/OS <br />03/0'�/08 <br />11/0'{/08 <br />01 /01/08 <br />Q1/01f08 <br />Q7/01 /09 <br />08/01/09 <br />09/01 /09 <br />01/01/10 <br />Complete <br />07/01 /07 <br />�7/01 /07 <br />10/15/07 <br />07/Q1/07 <br />07/01 /07 <br />07/31/07 <br />0$/31/07 <br />Q3/01/08 <br />09/31l07 <br />12/31/07 <br />10/01/08 <br />10/01 /07 <br />11/09/07 <br />Q9/30/07 <br />asr�oios <br />03/01/09 <br />Q9/31108 <br />12/31/08 <br />07/04/08 <br />06/01/09 <br />09/31/09 <br />05/31/09 <br />03/12/10 <br />09/31 /09 <br />12/31 /09 <br />02/01/10 <br />L� <br />� <br />Appendix B to Grant Contract No. C150227 <br />Page 4 of 6 <br />