My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150227 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2011 1:22:31 PM
Creation date
6/29/2010 3:32:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150227
Contractor Name
South Platte Ditch Company
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , � • <br />enable interested parties to be updated on progress of the project. A Project Final <br />Report will be prepared in Phase III. This report will be made available in electronic <br />format from the U.S. Bureau of Reclamation's Hydraulics Investigations Group website. <br />At the conclusion of Phases I and II, an interim review will be performed and details of <br />upcoming tasks will be refined to reflect knowledge gained through efforts completed to <br />date. A memo documenting these interim reviews will be provided to CWCB <br />representatives. As may be seen in the Project Schedule, there will be some overlap in <br />the duration of some of the tasks grouped under different p�oject phases. <br />Phase I Tasks Mot�itoring � Base Station Setup <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />�. <br />8. <br />9. <br />10 <br />Install stage-discharge recorders at flumes on the J&E SH recharge Sites <br />Construct new flume at SPDC G2 Sandhill ditch site (to replace excessively <br />submerged flume) <br />Install radio/control units at SPDC office and recharge sites <br />Install radio/control units on first group J8�E SH wells (4 wells) <br />Install radio%ontroi units @ J8�E SH (FLG) recharge pond and office <br />Install radio/control unit @ DWR designated site <br />Link the radio/control unit at the SPDC upper flume site with the nearby <br />(Kautz) lift pump <br />Begin development and testing of data processing system in spreadsheet <br />environment (and installation on SPDC and J8�E SH office units) <br />Organize and host field day <br />Conduct and document an interim project review: self assessment and report <br />to CWCB and Division One Colorado Department of Water Resources <br />(CDWR) office <br />Phase il Tasks Monitoring � Control <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />Motorize gates on SPDC spillway check structure near the diversion <br />measurement flume and automate structure to maintain target flow at the <br />flume <br />Install a long-throated flume in an existing rectangular conCrete section at the <br />entrance to Smith #3 pond on SPDC recharge system to replace check-weir <br />measurement <br />Install sharp-crested weir blades on the existing check-weir at the entrance to <br />the Sandhill pond on the SPDC recharge system <br />'�*Install radio units on 2" group of J&E SH wells (3 wells) <br />Install radio/controls unit @ 2 SPDC company lateral flumes. One at the <br />upper end flume location and one at the (Albrandt) flume near the lower end <br />of the lateral. <br />Continued development of spreadsheet-based data management tool <br />Organize and host second annual field day <br />Conduct and document an interim project r�view: self assessment and report <br />to CWCB and Division One CDWR office <br />Appendix B to Grant Contract No. C150227' <br />Page 2 0# 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.