My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte Steering Committee Meeting Minutes
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
South Platte Steering Committee Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2010 3:41:20 PM
Creation date
6/23/2010 1:06:34 PM
Metadata
Fields
Template:
Water Supply Protection
Description
South Platte Steering Committee
State
CO
Basin
South Platte
Water Division
1
Date
10/6/1961
Author
South Platte Steering Committee
Title
South Platte Steering Committee Meeting Minutes
Water Supply Pro - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t a <br />of Engineers that they would have their full coop- <br />eration. He also thanked the state for their <br />active interest in the activities. Harold Davis <br />prepared a report for that meeting. That's all I <br />have on this statement I have here. <br />Joe Barrett discussed the effect of ground <br />water flows and effect of pumping which must be <br />studied in detail and also the problem of ground <br />water recharge. <br />There was one question that came up and that <br />was the problem of the Burlington ditch losing the <br />Denver sewage water for irrigation by the movement <br />of the metropolitan sewage plant downstream to the <br />mouth of Clear Creek. Those things need to be <br />evaluated. <br />The evaluation and merits of the Weld County <br />and Narrows sites and the control of Bijou bene- <br />fits indicated there were not enough to provide <br />flood control for the Bijou Creek in the Narrows <br />site. He said that even the channel from Bijou <br />Creek to the Narrows Reservoir was not justified. <br />'Glenn Saunders asked a question whether <br />flood protection for the Englewood area on the <br />South Platte was to be included in the plan, the <br />basin -wide study. Russell Wiethop, Corps of <br />Engineers, stated that the Corps' plan at the <br />present time had not included that but he knew <br />that they would include all the areas that were <br />problem areas in the Basin study for flood con- <br />trol. <br />Mr. Sparks, at that time, stated that they <br />expected the Missouri Basin Power Fund to parti- <br />cipate in the cost of the construction of this <br />project. He explained that the amount of parti- <br />cipation would be the monies in excess of the <br />ability of the farmers to repay for the irriga- <br />tion portion of the project. <br />The way I have my notes here, I don't think <br />I have a whole lot to offer, gentlemen. I'd <br />rather, after this meeting, rewrite this and pre- <br />pare it as a written statement rather than prepare <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.