Laserfiche WebLink
<br />- 2- <br /> <br />. Water users had questions about the progress, scope of work, and environmental mitigation costs <br />that will add to the current estimate of approximately $4,000/ AF for the target reallocation storage <br />pool of 20,600 AF. <br /> <br />o Environmental Mitigation work completed so far includes year 2000 Biological and <br />Cultural Resources Inventory Reports prepared by Tetra Tech that are posted on the <br />CWCB website. <br /> <br />o Tetra Tech has completed an initial inventory for signs of endangered species (Ute Ladies <br />Tresses, Prebles Meadow Jumping Mouse, and Colorado Butterfly Pant) and has had initial <br />meetings with the Corps and the U.S. Fish and Wildlife Service. <br /> <br />o Tetra Tech has spent a few weeks recently in August 2004 conducting additional <br />inventories for Threatened and Endangered (T&E) species. <br /> <br />o There will be more years of T &E species inventories required by the Fish and Wildlife <br />Service. <br /> <br />. New Study activities are the Cost Benefit Analysis, Downstream Flooding Impacts Investigation <br />(U ses flood routing model created by Corps to the state line), and investigation into other facilities <br />or alternatives suitable for meeting water needs. These study tasks are all part of the overall <br />project work plan. <br /> <br />. Many of the water user questions can be answered by reading the meeting minutes and reports <br />posted on the CWCB web site http://cwcb,state.co.usfFlood IntIo.btm Reoccurring questions <br />by water users seem to be budget related and study costs. The project funds come from the <br />CWCB and the Army Corps of Engineers-Omaha District. <br /> <br />o This is on a 50/50 cost share basis. The CWCB has received some in-kind credit for work <br />on the study also. <br />o The original scope of work was for $2 Million to complete the study. <br />o The Corps assumed project administration in the fall of 2003. <br />o Tetra Tech was hired as the environmental contractor in the fall of 2003 as well. <br /> <br />. Additional Study costs are currently estimated at $1.2 million + $70,000 for additional threatened <br />and endangered plant surveys. This means that approximately $635,000 is needed by the Corps of <br />Engineers and $635,000 is need by the CWCB and other non-federal project sponsors to get <br />through Environmental impact Statement (EIS) process and preparing an EIS. <br /> <br />o The CWCB has $150,000 allocated to this project for the state fiscal year 2005 that started <br />on July 1,2004. <br /> <br />o Additional study costs are needed to complete the study by non-federal partners. $635,000 <br />(needed) - $150,000 (CWCB funds) = $485,000 (non state or non federal cost share needed <br />to bring the project to completion). <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />