Laserfiche WebLink
Name of Applicant: Douglas County Regional Water Conservation Plan <br />Date Received: 12 -10 -09 Date Reviewed: 4 -6 -10 <br />HB 04 -1365: Evaluation checklist for OWCDP staff <br />Applicant Demonstrates: <br />Yes <br />No <br />Comments: <br />That it is a covered entity <br />x <br />N/A County govt. <br />If answered "no" to the above question, then is it an entity which will <br />soon become a covered entity? <br />(Only answer this question if the applicant is NOT currently a <br />"covered" entity) Did they provide a reasonable engineering estimate <br />of future annual retail demand for the next 3 -5 yrs. , all based on <br />population projections, building permits, expected new taps, and or <br />some other creditable information that would show that the entity will <br />become a "covered" entity <br />Disclosure of organizational structure /chart <br />Current retail water demand for each of the past five years (in acre ft. <br />N/A <br />20 providers will <br />or million gallons) <br />be collected, not <br />feasible at this <br />point in process <br />see Contingency <br />Approval <br />A written statement from the entity's governing board, stating the <br />x <br />Yes, pg.7 <br />entity's commitment to the "plan" and the implementation of long -term <br />water savings measures and programs (w /authorized signature) <br />Cover letter with the entities: name, contact information, and a <br />x <br />Email dated <br />signature of an individual with the authority to commit the resources of <br />1/21/10 <br />the entity <br />A list of people and/or organizations that will be involved in assisting <br />x <br />with putting the plan together (list of who will be utilizing the grant <br />money) <br />Not required, but preferred, Information characterizing past water use <br />N/A <br />20 providers will <br />by sector, (e.g. residential, commercial, industrial) and the source (e.g. <br />be collected, not <br />surface water, groundwater, etc). <br />feasible at this <br />point in process <br />see Contingency <br />Approval <br />Characterization of the water system: <br />Current (and if available past) per capita water use for the last five <br />N/A <br />20 providers will <br />years and the basis for this calculation <br />be collected, not <br />feasible at this <br />point in process <br />see Contingency <br />Approval <br />Past, current, and predicted future population served by the entity, (and <br />x <br />the source of this information) <br />List estimated water savings goals to be achieved through the <br />x <br />Goals are more <br />implementation of the "Plan ", based on water system, the past <br />process oriented <br />