My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - San Antonio River El Codo Ditch Diversion Rehabilitation_Purchase Order & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - San Antonio River El Codo Ditch Diversion Rehabilitation_Purchase Order & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:17:44 AM
Creation date
1/21/2010 2:52:50 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
El Codo Ditch Company
Description
San Antonio River-El Codo Ditch Diversion Rehabilitation
Account Source
Basin
Board Meeting Date
5/20/2009
Contract/PO #
10000000001
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 4, 2009 <br />and slopes. Bar splices shall be staggered with bars lapped at least 30 bar diameters, but not less <br />than 19 inches. Stationing refers to centerline of construction and is the measured horizontal <br />distance. Contractor will perform all excavations in conformance with OSHA part 1926 subpart <br />P which may include flattening or shoring side slopes to maintain trench slope stability. <br />Procedure <br />Pump water to divert from construction siteas needed — throughout project <br />Pour 3.5" inch footer for stemwalls <br />Set forms for stemwall, tie re -bar and pour concrete <br />Backfill stemwalls <br />Form floor, tie double knots of re -bars into stem walls <br />Stub out re -bar for vertical walls <br />Pour concrete on floors, installing control joint during pour <br />Form vertical walls <br />Tie all re -bars <br />Install chamfers <br />Build as -built forms for diversion <br />Pour concrete (wait two days) <br />Strip forms <br />Backfill <br />Deliverable Increase flows in the main channel of the San Antonio, thus maintaining instream <br />flows and water quality in low flow regimes and reducing sediment loading, woody debris and <br />logjams in high water conditions. Achieve full diversion of decreed priorities during low flow <br />regimes, and maintain design flows in the El Codo Ditch diversion and in the bypass of the San <br />Antonio River. <br />TASK 3 - Heating and Blanketing of Concrete — as needed <br />Description of Task - Protect concrete from freezing in the event of cold weather. <br />Method/Procedure — Per NRCS specifications. <br />Deliverable — Strength and longevity of concrete structures. <br />TASK 4 — Upgrading Sluice Gate (2 days) <br />Description of Task replace existing system of installing or removing boards with gear /screw- <br />driven metal gate. <br />Method/Procedure - Reeds Tire & Welding construct knife plate for sluice gate. Weld in <br />framework for gate and install NRCS- designed pre- fabricated gate. Replace the existing sluice <br />gate with a new gate system. Install according to NRCS specifications. <br />Deliverable - Safe control of sluice gate regardless of water level. Improved operational control <br />of flows during low flow regimes and reduced sediment loading, woody debris, and log jams in <br />high water flows. <br />El Codo Ditch Company 6 Updated Statement of Work <br />