My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Arkansas Valley Conduit_Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Arkansas Valley Conduit_Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 5:44:38 PM
Creation date
11/6/2009 12:45:59 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Southeastern Colorado Water Activity Enterprise
Description
Arkansas Valley Conduit
Account Source
Statewide
Board Meeting Date
3/13/2007
Contract/PO #
150406
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 604 - Evaluate Project Water Yield <br />Evaluate the yield of project water, including re-use of return flows by either exchange or <br />possibly trades between project participants, as well as storage options such as the Preferred <br />Storage Options Plan (PSOP), If and When Accounts, or Excess Capacity Accounts. <br />Task 605 - Evaluate Operational Alternatives <br />Evaluate operational alternatives that may allow for various operations between participants. <br />The options may include regionalization or consolidation of water providers and their delivery <br />areas, how best to maximize Project Water usage, and blending of original water source with <br />Proj ect water. <br />Deliverables will include a technical report detailing recommendations concerning the planning <br />efforts to be implemented, potential yield of the available water rights, and potential cooperative <br />operations and alternatives among the various participants. <br />These tasks and deliverables will provide valuable infortnation to the Conduit participants, <br />District Engineer, SECWCD, and water users along the lower Arkansas River. It will also assist <br />Conduit participants in evaluating potential additional supply alternatives for their future and <br />protecting these supplies from out-of-basin entities. The findings from the investigations <br />described above will assist the Conduit participants in maximizing their use of available supplies <br />and identify potential operational alternatives. <br />Task Groun 700 - Contract Oversip-ht and Coordination <br />The purpose of these tasks will be to provide oversight and coordination of all of the aspects of <br />the grant project and to verify completion of each task including any deliverables required. <br />Specific tasks include: <br />Task 701- Prepare RFP's for Required Elements and Select Contractors <br />Requests for Proposals will be required for various elements of the work tasks. These proposals <br />will need to drafted, distributed to qualified companies and then a contractor chosen based on a <br />set of qualifying parameters. Contracts will then be required for each contractor. This process <br />will be handled by a team consisting of the Project Manager, Black & Veatch, District <br />management team and legal counsel. <br />Task 702 - Prepare, Monitor, and Verify Compliance with Contracts for Subcontractors <br />Contracts awarded to contractors chosen in Task 701 will require monitoring for progress and <br />completion. The Projects Manager will be responsible for completing this task. <br />Task 703 - Invoice Preparation and Submission to EPA and Payment Tracking <br />Completed work will be verified for compliance with grant requirements. Additionally, invoices <br />will be submitted to EPA for payment and these payments tracked. This process will be <br />overseen by the CFO and Grant Coordinator.
The URL can be used to link to this page
Your browser does not support the video tag.