Laserfiche WebLink
Task 204 - Prepare Preliminary Mapping for Preferred Alignment <br />Preliminary mapping will be prepared for the preferred alignment to be used as a base for further <br />evaluation. The mapping will be used to develop the conduit profile and hydraulic model. <br />Task 205 - Prepare Preliminary Profile of Preferred Alignment <br />A preliminary profile will be developed for the preferred alignment. The profile will be used to determine <br />participant tie-in locations and for facility siting evaluations. <br />Task 206 - Identify Participant Water System Tie-In Locations <br />Information will be gathered from participants to identify desirable water system tie-in locations to the <br />Conduit. These locations will be used to develop the hydraulic model. Water pressure needs and <br />availability will be determined. <br />Task 207 - Conduct Facility Siting Evaluation for Filter Plant and Storage Tanks <br />Based on the preferred alignment mapping and profile, an evaluation will be conducted to determine the <br />optimum water filter plant and storage tank locations along the Conduit. <br />Task 208 - Review and Update Projected Conduit Water Demands <br />Participant water demands will be reviewed for inclusion in the hydraulic model. <br />Task 209 - Prepare Hydraulic Model <br />A hydraulic model will be prepared to assess the watez flows and pressures in the Conduit. <br />Information from previous tasks will be used as the basis for the model. Results from the hydraulic <br />model will be used to confirm the pipeline sizes, storage tank capacity, and filter plant capacity for the <br />Conduit. <br />Task 210 - Evaluate Water Quality Impacts <br />Effects of water age and water source blending on water quality will be evaluated for the Conduit. Some <br />of the entities will be using water brought down the Conduit to blend with their existing supplies in order <br />to bring their water within drinking water standards. Required quantities and resulting quality will need <br />to be understood and analyzed to understand the complexities of this process. <br />Deliverables will include a summary technical memorandum of the alternative routes developed, <br />property ownership maps, a preferred alignment plan and profile drawing, hydraulic model, <br />findings of the facility siting for the filter plant and storage tanks, and water quality impacts. <br />These tasks and deliverables are vital to assuring that the technical aspects of the Conduit are <br />workable and obtainable within the prescribed budget. <br />Task Group 300 - Perform Environmental Reviews, Permittima Needs and <br />Constructabilitv Evaluations <br />The purpose of these tasks is to identify the necessary steps leading up to the environmental review <br />process. In addition, permitting requirements will be identified and action plans developed to secure the <br />permits. These tasks will also look at the many outside factors that could affect how the Conduit is laid <br />out and constructed. <br />4