Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />ESTIMATED CAPITAL AND OPERATION/MAINTEMANCE COSTS <br />ALTERNATIVE 5 - DIRECT PUMPING TO CANALS <br />FROM MACK POINT OF DIVERSION <br />Costs in 1990 Dollars <br />CAPITAL COSTS <br />------------- <br />Diversion Structure, Pumping Station, <br />Pipelines 90", 26,500 l.f. 25225/l.f. <br />84", 18,000 l.f. a 210/1.f. <br />Highway Crossings, Railroad Crossings, <br />Irrigation Canal Crossings <br />Release to Canal Structures <br />30% Engineering, Legal, and Construction <br />Contingency Factor <br />OPERATION 8 MAINTENANCE COSTS <br />------------------------------- <br />310 cfs <br />$6,657,000 <br />5,963,000 <br />3,780,000 <br />500,000 <br />400,000 <br />--------------- <br />-17,300,000 <br />5,190,000 <br />--------------- <br />$22,490,000 <br />Power Cost - Pump directly to Canals once every 4 years for 60 days. <br />17,916,480 kwh/4yr (250.08) 358,330 <br />Maintenance 90,000 <br />--------------- <br />AVERAGE ANNUAL 0/M $448,330