Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />ESTIMATED CAPITAL AND OPERATION/MAINTENANCE COSTS <br />ALTERNATIVE 6 - DIRECT PUMPING TO CANALS <br />FROM UPSTREAM DIVERSION POINT <br />Costs in 1990 Dollars <br />CAPITAL COSTS <br />------------- <br />Diversion Structure, Pumping Station, <br />Pipelines 900, 22,000 l.f. at225/l.f. <br />W, 15,000 l.f. 2 210/l.f. <br />Highway Crossings, Railroad Crossings, <br />Irrigation Canal Crossings <br />Release to Canal Structures <br />500,000 <br />400,000 <br />--------------- <br />-15,657,000 <br />30% Engineering, Legal, and Construction <br />Contingency Factor 4,697,000 <br />--------------- <br />520,354,000 <br />OPERATION & MAINTENANCE COSTS <br />------------------------------- <br />Power Cost - Pump directly to Canals once every 4 years for 60 days. <br />17,602,560 kwh/4yr (20.08) 352,050 <br />Maintenance <br />AVERAGE ANNUAL 0/M <br />310 cfs $6,657,000 <br />4,950,000 <br />3,150,000 <br />80,000 <br />--------------- <br />-432,050