Laserfiche WebLink
ESTIMATED CAPITAL AND OPERATION/MAINTENANCE COSTS <br />ALTERNATIVE 4 - COMBINED PUMPING AND <br />DIRECT FLOW TO CANALS (INCLUDES <br />EAST BRANCH AND ADOBE RESERVOIRS) <br />Costs in 1990 Dollars <br />CAPITAL COSTS <br />------------- <br />East Branch Creek Data <br />Adobe Creek Dam <br />Diversion Structure, Pumping Station, <br />Pipelines 60", 26,500 l.f, 2S150/l.f. <br />54", 3,000 l.f. 2 137/l.f. <br />42", 23,000 l.f. N 88/l.f. <br />36", 18,000 l.f. a 75/l.f. <br />Highway Crossings, Railroad Crossings, <br />Irrigation Canal Crossings <br />Access Roads <br />Release to Canal Structures <br />30% Engineering, Legal, and Construction <br />Contingency Factor <br />125 cfs <br />$14,000,000 <br />12,000,000 <br />3,450,000 <br />3,975,000 <br />411,000 <br />2,024,000 <br />1,350,000 <br />360,000 <br />150,000 <br />400,000 <br />--------------- <br />-38,120,000 <br />11,436,000 <br />--------------- <br />$49,556,000 <br />OPERATION 8 MAINTENANCE COSTS <br />------------------------------- <br />Power Costs - Evaporation makeup each year, and supply to Canals <br />once every 4 years for period of 60 days including refill of reservoirs. <br />Evaporation Makeup 2,450,600 kwh <br />Refill Reservoir 10,210,880kwh/4yr = 2,552,700 kwh <br />Direct Pump to Canal 8,117,2BOkwh/4yr = 2,029,320 kwh <br />7,032,620 kwh 1$0.08 $562,610 <br />Maintenance 125,000 <br />--------------- <br />AVERAGE ANNUAL 0/M $687,610