Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. USing ~-upon methods, analyze selected data and develop category <br />tw:l (data generated) SI curves. <br /> <br />3. Identify data gaps, and using expert jue.gement, develop interim SI <br />curves for those life stages and variables for which data are sparse. <br /> <br />4. Fully document all J:i1ases of the project. <br /> <br />5. Attain consensus (approval) b)r species experts on all ~ of the <br />project. <br /> <br />WORK ELEMF..NTS <br /> <br />The general format for the project involved having BIO/WEST summarize the <br />available data, and then during two W)rkshops develop a consensus of the <br />species ~rts on how the data would be analyzed for curve developnent. A <br />final report will be prep:l.red that summarizes the methods and results of the <br />study. SCheduling of the various work elanents is as folloW3: <br /> <br />w::lrk Element <br /> <br />Date of corrpletionjPerformance <br /> <br />Task. A: Data set Sl111IlIaries, <br /> S1JI'lI'Rary tables, and <br /> 51 curves summaries. Decanber 12, 1986 <br />Task. B: W:lrkshop #1. . January 5-9, 1987 <br /> Documentation of <br /> Workshop #1 January 23, 1987 <br />Task c: Draft Report with <br /> curves . March 20, 1987 <br />Task D: w::lrkshop #2 . March 3O-.April 3, 1987 <br /> Documentation of <br /> Workshop #2. . April 17, 1987 <br />Task E: Draft Final Report. .May 8, 1987 <br />Task F: Final Report. June 19, 1987 <br /> <br />2 <br />