My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150297 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150297 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:13:22 PM
Creation date
8/5/2009 10:58:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150297
Contractor Name
Farmers Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Adams
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A/ternative No. 4- Rep/ace the Upstream Out/et Gates and Repafr the <br />Out/et Conduits <br />This alternative consists of replacing the upstream outlet gates and repairing the steel lined section of <br />the outlet conduits. In this alternative the reservoir would be drained down to facilitate construction at <br />the gates and replacement of the 44 inch steel lined section of outlet conduit. The existing gates and <br />operators would be removed. Two new slide gates would be installed. The installation requires a <br />connection to the outlet conduits, so the upstream most segments of the existing conduits would be <br />removed and replaced as part of the installation. This work would include replacing the segment of <br />conduit where the leak currently exists through the existing fitting. New hydraulic operators would be <br />installed along the upstream face of the dam. Operators would be encased in concrete to minimize the <br />potential for ice damage. A new gate shack will be installed at the crest of the dam to house operations. <br />Power and a SCADA system will be run to the gate shack and the system will be configured to facilitate <br />both local operations at Milton Reservoir and remote operations from FRICO's office in Brighton. <br />While the reservoir is drained, FRICO will also be ab~e to remove the existing 44 inch steel lined sections <br />of the outlet works and replace them with new steel lining. This will be possible as a drained reservoir <br />offers less hydrostatic pressure on the outlet works, provides a condition where work within the outlet <br />can be completed in the dry, and removal of the existing outlet gates will provide a source of fresh air for <br />working within the conduit. <br />This alternative would meet all of FRICO's objectives by replacing the updated headworks and allowing <br />upstream operations of the reservoir. It would also repairs the aged steel lined conduit section and <br />provide FRICO with the ability to operate flows through the system is a safe environment. <br />Our opinion for the probable cost for Alternative No. 4 project is $630,192.80 as shown below on Table <br />3. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.