My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Prehearing Statement of the Town of Silverton
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Prehearing Statement of the Town of Silverton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:41:25 PM
Creation date
7/27/2009 10:35:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.51A1a
Description
Applicant's Prehearing Statements: Legal Documents
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/6/2005
Author
David W. Robbins, Mark J. Wagner
Title
Prehearing Statement of the Town of Silverton
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Leo M. Eisel, Ph.D., P.E. <br />Centerport Project, Adams County, Colorado • <br />ProjectManager. Completed an analysis of an alluvial gxoundwater supply. <br />This included 9uantifying available alluvial water supplies and deterinining <br />necessary water rights matters, which must be addressed in order to allow <br />the pxoject to develop this source of watex supply. <br />Bolt Lakes Reservoir Feasibility Study, Town of Minturn, Colorado <br />Przrject iVlanager. Completed feasibility analysis for xehabilitating Bolts Lake <br />reservoir for water supply purposes. Completed engineering analysis of <br />Town's water rights for purposes of determining adequacy of rights for <br />serving as a source of supply for reservoir enlargement. <br />Replacement Supply Analysis, South Adams County Water and Sanitation <br />District, Colorado <br />PmjectManager. Perfoxmed analysis to evaluate alternative sources to replace <br />contaminated water supply. Assisted in completing project to acquire 4,000 <br />acre-feet of xeplacement water supply. <br />Recreational Reservoir Study, Longs Peak Council Boy Scouts of America, <br />Colorado <br />Pmject Manager. Completed a feasibility investigation fox an off-stseam <br />reservoir for recreational purposes togethex with an augmentarion plan for a <br />camp owned by the council. <br />Water Supply Investigation, THF Prairie Center Development, Brighton, Colorado • <br />PynjectManager. Responsible for the investigation of potential sources of <br />direct and augmentation watex supply for the Pxairie Center Development. <br />This work includes investigation of the feasibility of using the discharge <br />from the London Fault Mine for augmentarion supply, as well as providing <br />engineering support for water quality and permitting issues associated with <br />the mine's disch.arge. <br />Water Quality <br />Water Supply Quality Analysis, Vail Associates, Vail, Colorado <br />PmjectManager. Deterinine the adequacy of watex treatment measures from <br />the Eagle Mine for protecting the Beaver Creek water supply. Evaluated <br />possible water supply sources for development at Vail. <br />Water Quality Analysis, Cadbury/Schwepps, Manitou Springs, Colorado <br />ProjectMaszager. Conducted feasibiliry and water quality analysis for <br />developing a source of spring water for bottled water purposes. Water <br />quality monitoring was conducted, together with the necessary analysis, and <br />a determination of any necessary ueatment required. <br />London Mine Discharge Water Quality Assessment, THF Prairie Center <br />Development, Alma, Colorado <br />ProjectManager. :Evaluated effects of mine discharge on water quality in the <br />Mosquito Creek Basin, with the objective of proposing a site-specific zinc • <br />C1DOCUmen6 and SetOngs\mark.wa9ner\Local SettlngslTemporary Internet Files10LK17\Eisel_Leo.dac
The URL can be used to link to this page
Your browser does not support the video tag.