My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EA 2007 Water Year AOP
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
EA 2007 Water Year AOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:34 PM
Creation date
6/25/2009 10:00:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.450
Description
EAC/RCC Meetings
State
CO
Basin
South Platte
Water Division
1
Author
EA Manager, EAC
Title
EA 2007 Water Year AOP
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2. Release Priorities for the Environmental Account for the Water Year 2007 (Tlte two pucse flow periorts are shaded) <br />Period Recovery Flow Principal Affected Resources 2007 Water Comments <br /> Targets (cfs) at Year <br /> G.I. Priority <br />Oct 1- Nov 15 2,400 (wet) whooping crane, waterfowl Low Although flows will be well below dry flow targets <br /> 1,800 (normal) durin this eriod EA ca <br />g p , rry-over plus 10 percent of <br /> 1,300 (dry) the SNI will be conserved for higher priority uses later <br /> in the water year. <br />Nov 16 - Dec 31 1,000 fish community, bald eagle Low Projections indicate flows will be at or near dry year <br /> 1,000 targets during this period. <br /> 600 <br />Jan 1- Jan 31 1,000 fish community, bald eagle Low Projections indicate flows will be at or near dry year <br /> 1,000 targets during this period. <br /> 600 <br />Feb 1- Feb 15 1,800 sandhill crane, waterfowl, fish community, Low With similar 2004 to 2006 gains during this time <br /> 1,800 bald eagle period, projections indicate flows may be at or near dry <br /> 1,200 targets during this period. <br />Feb 16 - March 15 3,350 Sustaining beneficial processes of the river High Estimates indicate continued shortages to dry year flow <br /> 3,350 and riparian wetland systems such as ice- targets during this period in 2007. If conditions are <br /> 2,250 scouring for channel maintenance (e.g., in- conducive to pulse flow augmentation and adequate <br /> channel vegetarion removal); sediment supply; planning and coordinarion has occurred, highest <br /> sandbar formation; nutrient cycling; and priarity will be given to using the EA to enhance <br /> groundwater recharge to stimulate biological desired river processes as described in the Principal <br /> activity in wet meadows. Affected Resources sections during this time period. <br /> Highest priority will be given to pulse flow <br /> augmentation/creation during the months of February, <br /> March, or A ril. <br />March 16-March 22 1,800 sandhill crane, waterfowl, fish community, Low With similar 2004 to 2006 gains during this time <br /> 1,800 bald eagle period, projections indicate flows will be at or near dry <br /> 1,200 year targets. <br />Water Year 2007 EA AOP 9 January 19, 2007
The URL can be used to link to this page
Your browser does not support the video tag.