My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Governance Committee Meeting and Materials
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
PRRIP Governance Committee Meeting and Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:13 PM
Creation date
6/22/2009 12:27:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.750
Description
Governance Committee
State
CO
Basin
South Platte
Water Division
1
Author
PRRIP
Title
PRRIP Governance Committee Meeting and Materials
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 4) As EA water bypassing the CNPPID diversion nears its peak value at the Overton gage, <br />EA water previously routed to the Johnson Lake reregulating storage and CNPPID's <br />"hydrocycling water" is released via the J-2 Return to time and match up with other water <br />arriving at Overton. <br />5) The estimate of potential EA volume released for an initial pulse flow test is <br />approximately 25,000 af and estimated Bypass costs are approximately $155,000. <br />Calculations of EA volume released, bypassed, and bypass costs are shown on the <br />worksheet. <br />0 <br />0 <br />Water Year 2008 EA AOP 15 October 15, 2007
The URL can be used to link to this page
Your browser does not support the video tag.