Laserfiche WebLink
. 4) As EA water bypassing the CNPPID diversion nears its peak value at the Overton gage, <br />EA water previously routed to the Johnson Lake reregulating storage and CNPPID's <br />"hydrocycling water" is released via the J-2 Return to time and match up with other water <br />arriving at Overton. <br />5) The estimate of potential EA volume released for an initial pulse flow test is <br />approximately 25,000 af and estimated Bypass costs are approximately $155,000. <br />Calculations of EA volume released, bypassed, and bypass costs are shown on the <br />worksheet. <br />0 <br />0 <br />Water Year 2008 EA AOP 15 October 15, 2007