Laserfiche WebLink
• • • <br />Table 2, Release Priorities for the Environmental Account for the Water Year 2008 (The two pulse flow periods are shaded) <br />Period Recovery Flow Principal Affected Resources 2008 Water Comments <br /> Targets (cfs) at <br />A Year Priority <br /> G.I. __ <br />Oct 1- Nov 15 2,400 (wet) whooping crane, waterfowl Low Although flows are anricipated to be below dry flow <br /> 1,800 (normal) targets during this period, EA carry-over plus 10 <br /> 1,300 (dry) percent of the SNI will be conserved for higher <br /> priority uses later in the water year. <br />Nov 16 - Dec 31 1,000 fish community, bald eagle Low Projections indicate flows will be at or near dry year <br /> 1,000 targets during this period. <br /> 600 <br />Jan 1= Jan 31 1,000 fish community, bald eagle Low Projections indicate fiows will be at or near dry year <br /> 1,000 targets during this period. <br /> 600 <br />Feb 1- Feb 15 1,800 sandhill crane, waterfowl, fish community, Low With similar gains as in 2007 during this time period, <br /> 1,800 bald eagle projections indicate flows may be above dry targets <br /> 1,200 during this period. With gains similar to those of <br /> 2004 to 2006, flows would be at or near dry targets. <br />Feb 16 - March 15 3,350 Sustauung beneficial processes of the river ? Estimates indicate continued shortages to dry year <br /> 3,350 and riparian wetland systems such as ice- flow targets during this period in 2008. If conditions <br /> 2,250 scouring for channel maintenance (e.g., in- are conducive to pulse flow augmentarion and <br /> channel vegetation removal); sediment supply; adequate planning and coordinarion has occurred, <br /> sandbar formarion; nutrient cycling; and highest priority will be given to using the EA to <br /> groundwater recharge to stimulate biological enhance desired river processes as described in the <br /> acrivity in wet meadows. Principal Affected Resources sections during this time <br /> period. Highest priority will be given to pulse flow <br /> augmentation/crearion during the months of February, <br /> March, or A ril. <br />March 16-March 22 1,800 sandhill crane, waterfowl, fish community, Low With similar gains as in 2007during this time period, <br /> 1,800 bald eagle projections indicate flows will be at or near dry year <br /> 1,200 targets. <br />Water Year 2008 EA AOP 16 October 15, 2007